The first and foremost installation stage of the Sewage Treatment Plant in India is to conduct pre-checks and when you have conducted the preliminary checks then, order a sewage treatment plant. Then, excavate a hole and select the appropriate base to be laid for the treatment plant. When the hole is ready then, place the tank inside it. After that, backfill the site and the set up along with wiring of the plant should be conducted by a well-expert technicians. The last step is commissioning to have the system commissioned with the help of a sewage service engineer from a well-reputed company like Clear ion Expert.